Making lab rigour visible: colour accuracy charts

Company
01net
Timeline
About 6 weeks
My role
Owned the product decisions
Team
One developer, editorial leadership, the testing team
Outcome
Charts in every new screen review, 29 older reviews updated

Summary

At 01net, I owned the product decisions on a project that turned the lab's colour accuracy data from dense text into interactive charts, in about 6 weeks with limited developer time. The charts now appear in every new screen review, and 29 older reviews were updated retroactively across 6 categories. The project also taught me to treat securing buy-in and scoping accurately as two separate jobs.

The published chart, iPhone 17 review, sRGB

Bar chart from 01net's iPhone 17 review: Delta E 2000 colour error for each tested colour in sRGB, all bars below 2, with an average of 0.6 and a maximum of 1.6. Lower values are better.
Each bar shows how far one colour drifts from its target. Average and maximum deviation below. Lower is better.

The problem

01net's lab had rebuilt how it tests screen colour accuracy, but readers never saw that rigour. The results sat in dense paragraphs of Delta E figures (a measure of colour error) that only experts could decode.

This mattered because screen quality drives the buying decision in 6 of our 10 most-tested categories (smartphones, tablets, monitors, laptops, gaming laptops and TVs). Those categories bring in the large majority of our test-section audience.

Years of testing had shown me that colour data is hard for non-experts to read. Before committing scarce developer time, I checked that this held for our own writers and readers:

  • Writers: our testing team flagged that colour results were hard to explain without visuals.
  • Readers: in informal conversations, readers told me our colour results were too complex and hard to read.

The competitor benchmark revealed the opportunity. All 5 main rivals showed colour results as text or as screenshots, either straight from the testing software or of static charts. Few test colour this deeply, and none let readers compare results at a glance. Presenting our results clearly would let us lead on both rigour and presentation, turning a hidden strength into something readers could see and trust.

Constraints

I had two hard limits: scarce developer time and a fixed deadline.

  • Developer time: limited, and shared with other priorities.
  • Deadline: brands send new TVs for review after CES, so the feature had to be live for that review cycle.

I owned the product decisions on this project, balancing four sets of needs. Editorial leadership wanted to showcase the lab. The testing team wanted faster writing. Engineering needed a feasible scope. Readers wanted quick answers. Given the deadline, I prioritised what could ship in time and what made the lab's rigour visible to readers. Faster writing tools would follow in a later iteration.

Discovery and decision

Framing the need. Readers needed to judge a screen's accuracy at a glance and compare products. Writers needed verdicts that were faster to write and easier to justify.

Options explored

  • Text only, as before: no visual at all, which was the problem.
  • Screenshots from the testing software: quick, but blurry, hard to read for non-experts, and exactly what competitors already do.
  • Static vector charts: not interactive, and each one drawn by hand in design software.
  • Interactive charts generated from the raw data: more build effort, but consistent across products, comparable and readable in seconds.

Recommendation. I recommended interactive bar charts built directly from the lab's measurement data. It was the most demanding option to build, but the best fit for both readers and writers. I agreed this direction with editorial leadership and the developer.

Testing the concept. Before any build, I prototyped two wireframes: several swipeable charts, or a single chart, and tested them with editorial leadership, the testing team and the developer. Both worked well, so we kept both: writers choose a single chart or a swipeable set, depending on the product.

The reader experience. Instead of a cropped screenshot, readers get a clean chart showing how far each colour drifts from its target, with the average and maximum deviation highlighted. They can swipe between colour standards (sRGB, P3, BT.2020) to see how a screen performs for web content, films and HDR.

MVP scope. The first version included bar charts, a minimal back office and our existing chart design. We deliberately left non-essential features, such as other chart types and fuller admin tools, for a later version.

Securing the slot. The project had to fit around other priorities, so it had to stay light. I asked the developer early whether that was feasible, and pushed for a minimal back office to keep the scope small. Together, we concluded it could work as a low-commitment project.

Delivery: the data was harder than expected

The hardest part was the lab's data. It turned out far messier than expected, and handling it properly cost us two weeks.

The work had three parts:

  1. The chart readers see in the review.
  2. The back office, the internal tool writers use to add charts to reviews.
  3. Data extraction, the step that pulls the figures out of the testing software's export files.

The export files had unlabelled figures and two measurement standards that needed separate handling. A complete result for one screen also took three files instead of one. Extraction took two to three times the estimated effort. The back office, scoped as minimal, needed far more work than planned.

The developer and I chose to build the extraction properly once, rather than patch it and reopen it later. We missed the first post-CES TV review but were ready for the second, and the first has since been updated.

Outcome

Within weeks of launch, the charts became a standard part of our screen reviews.

  • New reviews: every screen device we now test gets the charts, across all 6 categories.
  • Older reviews: 29 high-traffic reviews were updated retroactively across all 6 categories, starting with smartphones, our most important one (Apple, Google, Samsung, Xiaomi, Oppo and more), showcasing the lab's rigour on pages readers already visit.
  • Writers: they report that colour verdicts are now faster to write and easier to justify. They also described the charts as "better looking than expected" and "useful" for comparing products.

The next iteration focuses on smoother writer tooling, guided by writer feedback and adoption metrics.

Measuring success

Adoption tracking wasn't part of the first version, so I relied on two proxies: usage in 100% of new screen reviews, and qualitative feedback from writers, backed by regular checks of reader comments for any emerging issues.

Here is how I'd measure whether the charts work, for writers and readers:

LevelMetricWhat it tells us
AdoptionShare of screen reviews with a chart, and time for a writer to add oneWhether writers use it rather than work around it
EngagementSwipes between charts, taps to reveal a specific value, and time spent on the screen sectionWhether readers actually read the colour results

I'd also track mobile page load time as a guardrail, since interactive charts shouldn't slow down the review.

I wouldn't expect one chart to move traffic or affiliate revenue measurably, as its effect is too small to isolate from everything else on the page. The charts contribute to a broader bet, that visible lab rigour builds reader trust, which I'd measure across the whole testing strategy rather than feature by feature.

What I learned

Securing buy-in and scoping accurately are two different jobs, and I had merged them.

I was right that the data would be the hard part. What I missed was the back office. I kept it "minimal" to make the request lighter, but never wrote down what it actually had to do. When the data work grew, there was no plan to adjust, so the developer and I worked out the back office as we went. That added pressure to a tight schedule. It also risked eroding trust with engineering.

Trimming scope to protect limited developer time is normal PM practice. What went wrong was the method. I deferred by silence ("just build what's needed") instead of by decision ("here's the full scope, and here's what we're consciously leaving for later"). Both look the same in the moment, but only one leaves a plan to come back to.

Here is what I do differently now:

  1. Scope every part before pitching, even roughly, including unglamorous ones like admin tools.
  2. Label each item "now", "later" or "unknown" and share the full list with engineering. The pitch stays light, but every cut is a visible decision, not a gap.
  3. Test the riskiest part end to end. We did check the export files early, and they looked manageable. The complexity only surfaced once we processed complete real cases. Next time, I'd ask for a short spike that takes one full real case from export file to published chart before committing to a date.
  4. Agree a re-estimate checkpoint with the developer once that risky part is understood.
All case studiesGet in touchLinkedIn